REPT BATTERO Signs 3GWh Energy Storage Supply Agreement With Energy Vault
On September 16, 2025 (local time), REPT BATTERO Energy Co., Ltd and Energy Vault Holdings, Inc., a global leader in grid-scale energy storage solutions, signed a 2026 supply agreement in the United States. Under the agreement, REPT BATTERO will supply 3GWh of energy storage systems to Energy Vault in 2026, and the two parties will further deepen their cooperation in the Australian, U.S., and European markets.
REPT BATTERO and Energy Vault have maintained a cooperative relationship for three years, with a cumulative system supply volume exceeding 1.5GWh. The joint projects developed by both parties have been successfully delivered and commissioned in multiple markets across the United States, Europe, and Australia.
The signing of this 3GWh agreement not only marks the deepening and upgrading of the long-term cooperative relationship between the two parties, but also demonstrates REPT BATTERO’s product strength and delivery capabilities in the international energy storage market. The collaboration between REPT BATTERO and Energy Vault will provide strong support for the large-scale application of renewable energy and the stable operation of energy systems, driving the global clean energy transition forward.
Source: REPT BATTERO Energy Co., Ltd.