Featured Article
The Missing Link In Arc Flash Analysis: Risk Assessment
By Charles Helmick, Training Manager, AVO Training Institute
In the Fall of 2001 the 2002 National Electric Code (NEC) introduced a new requirement. Article 110.16 required electrical equipment to be field marked, to warn qualified persons about the arc flash hazard associated with exposed energized conductors.
Most Popular News
Renewable Energy For Everybody Through Renovated Power Grids
Spain Approves New Power Transmission, Distribution Laws
Integration Of Distribution Automation And AMI Networks Key To Maximizing The Benefits Of Smart Grid Deployments
California ISO Unveils Roadmap To Advance A Smarter, Stronger Power Grid
EDF Renewable Energy Confirms Turbine Order With Vestas For 220 Megawatts
ABB Wins $37M Transformer Order In Poland
NJ Natural Gas Receives Final BPU Approval To Add Largest Customer, TAQA-Red Oak Power
PHG Energy And General Electric Provide Renewable Power To West Tennessee City
Entergy Utilities Complete MISO Integration
AEP Receives All Necessary Approvals To Complete Separation Of Its Ohio Assets