Newsletter | November 5, 2012

11.05.12 -- Build-Outs Of HVDC Transmission Systems Help Integrate Renewable Energy

ElectricNet Newsletter

Industry News

Build-Outs Of HVDC Transmission Systems Help Integrate Renewable Energy
PJM Files To Increase Competition, Innovation, Participation In Electric Transmission Planning Process
Xcel Energy Boosts Transmission In NW Texas Panhandle
MidAmerican Transmission Enters The Competitive Arena With Joint Venture In Canada
EU Energy Directives Invigorates Chemicals And Materials Market In Smart Grid Infrastructure
BPL Global Delivers Breakthrough Transformer Monitor
SA Power Networks Of Australia Selects Telvent For Smart Grid Solutions
Nexans Wins Subsea Cable Contract For HVDC Power Interconnection Between Italy And Montenegro
Nation's Chains Honor Outstanding Electric Company Service
Accenture And Siemens Providing Smart Metering Solutions For Utilities Globally
View more headlines

Featured Download

TWACS® Prepayment Solutions: Datasheet
The TWACS prepayment solution delivers a cost effective and flexible way to collect payment in advance of your customers' usage. Recover debt, eliminate meter reading and billing, and better serve your customers while protecting — and even increasing — revenue.
Browse the download library

Featured Product

160 x 120 Resolution Infrared Camera for Electrical and Mechanical Applications: E40
The FLIR E40 Infrared Camera for electrical and mechanical predictive maintenance applications features a 19,200 pixel (160x120) infrared resolution, a 3.1 megapixel visible light digital camera with an LED lamp to provide clean images, regardless of light conditions, a -4 to 1,202°F (-20 to 650°C) temperature range, and more.
Download Datasheet
Request Information


FLIR Systems, Inc
160 x 120 Resolution Infrared Camera for Electrical and Mechanical Applications: E40